What it includes
Visual inspection, link identification, selection of relevant tests, measurement with suitable equipment, recording of results, reporting of faults and preparation of the REF based on the installation as built.
Infrastructure verification
Measurements and checks to demonstrate the performance of telecommunications installations and document the results in the Testing and Functionality Report (REF).

Verifiable results
Functional testing checks whether installed networks meet the conditions required for their intended performance. Measurements cover the systems relevant to the project and are compared with the corresponding technical criteria.
Results, equipment used, circuit identification and relevant observations are organised in the Testing and Functionality Report. Any non-conformities are reported for correction and subsequent verification.
Visual inspection, link identification, selection of relevant tests, measurement with suitable equipment, recording of results, reporting of faults and preparation of the REF based on the installation as built.
Depending on the installed networks, the work may cover continuity and performance of copper pairs, levels and response of coaxial networks, and optical fibre losses. The exact measurements are defined after reviewing the design, installation and applicable ITED manual.
Process
Before the visit, we confirm the networks, points, drawings and access arrangements. On site, we identify the links and carry out the planned tests. If results fall outside the criteria, we provide a clear list of corrections; the validated final readings are included in the REF.
View the ITED and ITUR manuals published by ANACOM
Frequently asked questions
The ITED design or as-built drawings, building identification, information about the installed networks, access to ATI and ATE cabinets, boxes and outlets, and details of any changes made on site.
The results must reflect the installation tested. Identified faults are reported and, where necessary, circuits are retested after correction before the documentation is completed.
No. They depend on the applicable manual edition, building type, specified networks and the installation as built.
Yes. Design can be commissioned separately or coordinated with final testing, with clear documentation for each stage.
Evidence of the relevant registration is provided to the client during the assessment and commissioning of the service.
Prepare for the visit
Send us the design, site location and expected completion date of the infrastructure. We will explain the information and conditions required.